The Berlin Stadtbahn is a historic elevated railway viaduct in Berlin. It runs from Ostbahnhof in the east to Charlottenburg in the City West, connecting several major destinations in central Berlin, including Berlin Central station. The line is a protected heritage structure since 1995. The tracks which connect the viaduct to Ostkreuz and Westkreuz at either end of the line are sometimes considered part of the Stadtbahn, although this is not technically correct.
The line connects the city's Berlin Zoo, Bellevue Palace, snakes around the governmental district to the Berlin Hauptbahnhof and Friedrichstraße, crosses Museum Island, and moves on to Alexanderplatz (Fernsehturm) and beyond.
First completed in 1882, it spans and 11 stations. of its length are elevated on 731 masonry viaduct arches. A further of the line is situated on 64 bridges, that cross adjoining streets and (three times) the river Spree. The remaining length of the line is on an embankment.
Today, the Stadtbahn is one of the busiest sections of rail in Germany. The line carries four tracks, operated as two pairs. The northern pair carry four Berlin S-Bahn lines, which service all 11 stations, and the southern pair of tracks are used by Regionalbahn, Regional-Express, Intercity, EuroCity and Intercity-Express. Six of the Stadtbahn stations have platforms on the southern tracks, though not all trains serve them.
In 1872, the Deutsche Eisenbahnbaugesellschaft (German Railway Construction Company - DEG) filed the planning application for a railway line through the city, connecting the then-Schlesischer Bahnhof (today Berlin Ostbahnhof) to Charlottenburg, and continuing to Potsdam. In December 1873, the state of Prussia as well as the private rail enterprises Berlin-Potsdamer Eisenbahn, Magdeburg-Halberstädter Eisenbahn and Berlin-Hamburger Bahn bought shares in the DEG, and jointly founded the Berliner Stadteisenbahngesellschaft (Berlin City Railway Company). However, things did not go as expected and the DEG went into bankruptcy in 1878, which forced the Prussian state government to take over operations, pay for the construction of the line with state money and to reimburse the former private owners of the DEG. The state's interest in the line was attributed to the military, which after the 1870-1871 Franco-Prussian War was of the opinion that the railway networks would hinder mobilisation when not properly interconnected.
On 15 July 1878 the Königliche Direktion der Berliner Stadteisenbahn (Royal Directorate of Berlin Urban Railways), under the management of Ernst Dircksen, was commissioned to manage the site. The directorate at first reported to the Prussian Ministry of Transport and later became a subsidiary of the Ministry of Public Operations.
The planned railway had two tracks each for freight and passenger traffic. Having taken similar projects in London and New York City into consideration, passenger traffic received priority over freight trains. Furthermore, the new railway line was not only to serve as a connection between the mainline termini in Berlin, but would also offer connections to the Berlin Ringbahn and the suburban rail lines.
The traffic routing was not only influenced by the location of the already existing stations the line was supposed to connect, but also by land availability in the city centre. One of the original drafts, which called for building the line along Leipziger Straße, had to be scrapped because of overly high land prices. The moat of the 17th century Berlin Fortress was filled up between Hackescher Markt and Jannowitzbrücke stations and, since it was public land, was used for building the railway line. This explains some of the curvy sections on the Stadtbahn, especially between Alexanderplatz and Jannowitzbrücke stations.
Its elevated nature sets the Stadtbahn apart from the previous Berliner Verbindungsbahn, built in 1851, which was built at street level and was a hindrance to travel.
The line initially only had 9 stations. Two stations were later added: Tiergarten (5 January 1885) between Zoologischer Garten and Bellevue, and Savignyplatz (1 August 1896) between Charlottenburg and Zoologischer Garten.
Since 1 May 1888 the Stadtbahn also connected to Stralau-Rummelsburg (Ostkreuz since 1933) in the east and Westend (via Westkreuz) in the west.
These trains ran from 4 o'clock in the morning to 1 o'clock at night, typically at intervals between two and five minutes, depending on the time of day. Fares in the early 20th century were 10 pfennig in 3rd class and 15 pfennig in 2nd class.
The remaining traffic on the Stadtbahn mostly consisted of express trains to Hanover and Cologne via the Lehrter Bahn, Kanonenbahn trains to Dessau, trains to Königsberg and Danzig on the Preußische Ostbahn and trains to Frankfurt/Oder and Breslau. Suburban trains to Spandau and Strausberg also ran on the Stadtbahn's long-distance tracks until 1928.
Trains heading west usually left from the Schlesischer Bahnhof station, those heading east from Charlottenburg. Depots were situated in Rummelsburg (then called Bw Karlshorst) and Grunewald.
A second long-distance platform and a new hall were built at Zoo station from 1934 to 1940. The station hall was only glazed in the 1950s, however. The notable terraced vestibule dates from the same time.
During the Berlin Blockade, the long-distance traffic came to an almost complete halt. The Stadtbahn was useful for the re-established S-Bahn, however, now with connections to places line Königs Wusterhausen, Strausberg, Staaken and Falkensee.
From 18 May 1952, when all Berlin terminal stations and all other long-distance stations in West Berlin were closed, the station Zoologischer Garten remained the only long-distance station for the western part of the city. The last domestic train of the GDR (East German) railways ran on the Stadtbahn in 1953.
After the Berlin Wall was built in 1961, Zoologischer Garten became the West Berlin and Ostbahnhof the East Berlin de facto central station. The station Friedrichstraße now was the terminal point of the separated West and East Berlin S-Bahn lines and departure point for the Interzonenzug (Inter-zone train) services between West Berlin and West Germany. Friedrichstraße station was separated into Eastern and Western parts with steel walls, and enabled West Berliners to change to S-Bahn trains running on the Nord-Süd-Bahn and the U6 line of the Berlin U-Bahn without passing through GDR border controls. The station also featured a border crossing into East Berlin.
Through trains between Zoo and Ostbahnhof only existed in international traffic, for example the Paris to Warsaw trains. Later, and shuttle trains connecting to the night trains to Scandinavia crossed the intra-German border on the Stadtbahn as well.
Due to a quirk in legislation, the West Berlin parts of the Stadtbahn belonged to the Deutsche Reichsbahn, which made it (and therefore the GDR government) one of the largest landowners in West Berlin. Regular quarrels erupted between the DR, the GDR government, the West Berlin Senate and the Allied occupation powers.
Prices for the West Berlin S-Bahn were kept slightly below the fares of the West Berlin BVG. In East Berlin, a flat fee of 0.20 Mark was charged until 1991. West Berlin politics and most of the populace fully boycotted the S-Bahn, which was run by the East German railways, and introduced bus and U-Bahn lines running parallel to the S-Bahn network and the Stadtbahn.
Meanwhile, the number of S-Bahn lines running in West Berlin was reduced to just three as a consequence of a strike carried out by the Deutsche Reichsbahn's West Berlin-based employees in September 1980.
On 9 January 1984 a treaty between the GDR and the West Berlin Senate came into force and turned over the responsibility for operation of the S-Bahn in West Berlin to the West Berlin transport authority, the Berliner Verkehrsbetriebe. Soon thereafter, talks with the GDR commenced regarding improvements of the Stadtbahn in West Berlin as well as the modernisation of the Zoologischer Garten station. The Lehrter Stadtbahnhof was also carefully restored to its original 1880s look and became a listed building. In East Berlin, the Ostbahnhof was partially rebuilt and renamed to Hauptbahnhof, in time for the 750th anniversary of Berlin's founding in 1987.
The western part of the Stadtbahn was electrified on 4 July 1993 up to Zoologischer Garten station. The eastern part of the line up to Ostbahnhof had been electrified since 1987. As soon as electrification reached the Zoo station, InterCityExpress trains began to use the station.
Between 2001 and July 2002, part of the Stadtbahn was realigned over the construction of the new Berlin Hauptbahnhof. The realigned section consisted of two 450 m-long bridges spanning the station and the adjacent Humboldthafen port.
Until the summer of 2006, the Stadtbahn was the main thoroughfare for long-distance trains, which usually stopped at Zoologischer Garten and Ostbahnhof (which was renamed in 1998). When the new Hauptbahnhof opened on 28 May 2006 the importance of the line diminished slightly, as many trains now would use the new north-south line connected to the Hauptbahnhof. The remaining intercity trains on the Stadtbahn, mainly those heading toward Hanover and Cologne, now usually call at Hauptbahnhof and Ostbahnhof.
In 2022 the concrete bedding installed between 1994 and 1998 was found to have developed difficult to repair fatigue damage. The attachment points of the thought to be much more durable solution had to be replaced quickly due to safety concerns. As of 2023, the concrete isn't slated to be replaced either; the work would be too complicated and take too much time, because of the viaduct structure.
The longer distance tracks carry Regionalbahn and Regional-Express routes RE1 (Magdeburg to Eisenhüttenstadt), RE2 (Rathenow to Cottbus), RE7 (Dessau to Wünsdorf-Waldstadt) and RB14 (Nauen to Berlin Schönefeld Airport). Although most InterCity and Intercity-Express trains now use the north-south tunnel route via Hauptbahnhof, some trains do still remain on the Stadtbahn's long distance tracks. These trains, mainly those heading toward Hanover and Cologne, usually call at Hauptbahnhof and Ostbahnhof.
The RE8 is the only line of the Stadtbahn that has a 24/7 service.
History
Planning
Construction
Initial operation
Suburban trains
Freight traffic
Long-distance trains
Station expansions and viaducts
Electric operation
Post-War situation
Restoration during the Cold War
After reunification
Modernisation from 1994
Current operation
Notes
Further reading
External links
|
|